NEXUS Send drawings
QUALITY / MATERIALS / VERIFICATION

Inspection is planned, not promised.

A clear reference drawing, known material sources and an inspection plan matched to the component — that is what “verified” means on this floor, and it is agreed before production starts.

DIMENSIONAL INSPECTION

Measure what matters to your assembly.

Equipment
Mitutoyo LEGEX 774
Quantity
1 unit
Measuring range
700 × 700 × 450 mm
Inspection basis
Your drawing — critical features, datums, revision

Certified systems

The factory operates a quality management system certified to ISO 9001 and an occupational health & safety system certified to ISO 45001. Certificates and the applicable scope are confirmed before production when your project requires them.

GATE 01

Define the requirements

Drawing revision, critical features, material, finish and inspection needs — confirmed before machining, so what is approved is what gets checked.
GATE 02

Identify the material source

Material procurement connects to the project: named producers, grades reviewed against requirements, certificates and traceability documentation agreed per order.
GATE 03

Plan the manufacturing route

Datums, fixtures, machining sequence and the specified secondary processes are coordinated so inspection lands on meaningful features.
GATE 04

Verify the agreed features

Mitutoyo LEGEX 774 coordinate measurement of critical features, surface finish checks, and reporting in the format agreed at review.
COMMON QUESTIONS

Asked before drawings move.

Do you hold quality certifications?
Yes — ISO 9001 for the quality management system and ISO 45001 for occupational health & safety. Tell us your documentation requirements and we confirm the applicable scope before production.
How do you verify dimensions?
Critical features are inspected per an inspection plan defined by your drawing, on our dedicated Mitutoyo LEGEX 774 CMM with a 700 × 700 × 450 mm measuring range.
Can you provide material documentation?
Materials are sourced from named producers, and grades, certificates and traceability requirements are reviewed and agreed per project.
What tolerances can you hold?
Published cases show critical tolerances of ±0.01 to ±0.02 mm on specific components. Tolerances are assessed per drawing during review rather than assumed — see the tolerances guide.

Need an independent party to re-verify first articles or audit the process before shipment? VeriPrec provides third-party inspection and sourcing verification over partner factories like this one.

START WITH YOUR DRAWING

Send the drawing that matters.

Chat on WhatsApp