QUALITY / MATERIALS / VERIFICATION
Inspection is planned, not promised.
A clear reference drawing, known material sources and an inspection plan matched to the component — that is what “verified” means on this floor, and it is agreed before production starts.
DIMENSIONAL INSPECTION
Measure what matters to your assembly.
- Equipment
- Mitutoyo LEGEX 774
- Quantity
- 1 unit
- Measuring range
- 700 × 700 × 450 mm
- Inspection basis
- Your drawing — critical features, datums, revision
Certified systems
The factory operates a quality management system certified to ISO 9001 and an occupational health & safety system certified to ISO 45001. Certificates and the applicable scope are confirmed before production when your project requires them.
GATE 01
Define the requirements
Drawing revision, critical features, material, finish and inspection needs — confirmed before machining, so what is approved is what gets checked.GATE 02
Identify the material source
Material procurement connects to the project: named producers, grades reviewed against requirements, certificates and traceability documentation agreed per order.GATE 03
Plan the manufacturing route
Datums, fixtures, machining sequence and the specified secondary processes are coordinated so inspection lands on meaningful features.GATE 04
Verify the agreed features
Mitutoyo LEGEX 774 coordinate measurement of critical features, surface finish checks, and reporting in the format agreed at review.COMMON QUESTIONS
Asked before drawings move.
Do you hold quality certifications?
Yes — ISO 9001 for the quality management system and ISO 45001 for occupational health & safety. Tell us your documentation requirements and we confirm the applicable scope before production.
How do you verify dimensions?
Critical features are inspected per an inspection plan defined by your drawing, on our dedicated Mitutoyo LEGEX 774 CMM with a 700 × 700 × 450 mm measuring range.
Can you provide material documentation?
Materials are sourced from named producers, and grades, certificates and traceability requirements are reviewed and agreed per project.
What tolerances can you hold?
Published cases show critical tolerances of ±0.01 to ±0.02 mm on specific components. Tolerances are assessed per drawing during review rather than assumed — see the tolerances guide.